background
SP Newsprint arrow   HC&S Sugar arrow  

HC&S SUGAR —
POWER BOILER ANNUAL SHUTDOWN
Maui, Hawaii

Service Provided
  • Phoenix Industrial has served as Primary Outage Contractor for the past four years
  • Replaced casing and buck stays for 160,000 lb/hr stoker boiler
  • Replaced generating tube banks
  • Replaced I.D. fan and foundation
  • Modified scrubber foundation to increase load capacity
  • Fabricated and installed 8' diameter exhaust stack to replace existing
  • Performed over 1,000 code welds with less than 1 percent rejection rate
  • Installed new Venturi superheater
  • Performed inspection and repair services to Code vessels and piping
Total Project Value
$500,000 (per outage)

Project Statistics
  • 7,500 man-hours (per outage)
  • Outages include emergency Christmas shutdown and regularly scheduled maintenance
  • Zero accidents
  • All work completed on-time
Project Timeline
Start Date
  January 2003

Completion Date
  Ongoing