SP Newsprint
HC&S Sugar
- Phoenix Industrial has served as Primary Outage Contractor for the past four years
- Replaced casing and buck stays for 160,000 lb/hr stoker boiler
- Replaced generating tube banks
- Replaced I.D. fan and foundation
- Modified scrubber foundation to increase load capacity
- Fabricated and installed 8' diameter exhaust stack to replace existing
- Performed over 1,000 code welds with less than 1 percent rejection rate
- Installed new Venturi superheater
- Performed inspection and repair services to Code vessels and piping
Total Project Value
$500,000 (per outage)
Project Statistics
- 7,500 man-hours (per outage)
- Outages include emergency Christmas shutdown and regularly scheduled maintenance
- Zero accidents
- All work completed on-time
Project Timeline
Start Date
January 2003
Completion Date
Ongoing