Cascade Steel Rolling Mills
Evraz-1
Evraz-2
Evraz-3
Evraz-4
Evraz-5
NUCOR Steel
SteelScape
- Phoenix Industrial provided design/build construction services for a new 45’ x 100’ warehouse storage building. Our construction disciplines included civil, concrete, structural steel, electrical services to.
Our scope included:
- Demolition and excavation of 500 cubic yards of soil, and installation of compacted backfill.
- Installation of 350 cubic yards of concrete for footings, grade beams and concrete floor.
- Supply and installation of 45’ x 90’ x 28’ pre-engineered metal building.
- Supply and installation of 25’ x 45’ x 15’ high mezzanine platform.
- Installation of electrical ground system, lights and outlets.
- Installation of fire water protection system, heating and insulation for the building.
- Installation of electrical ground system, overhead crane power, and area lighting.
Total Project Value
$1,500,000
Project Statistics
- 12,000 man-hours
- All work completed with no recordable or lost-time accidents
- All work completed on time and under budget
Project Timeline
Start Date
September 2005
Completion Date
May 2006