- Phoenix Industrial has completed several plant maintenance projects for client. Work included:
for the past two years.
Work included:
- Installation of new oil skimmer for exhaust stack
- Cut the top three feet off existing 48"-diameter exhaust stack using a plasma cutter. Top of stack 100'
above ground elevation
- Weld mating flange to existing exhaust stack
- Install oil skimmer, 200 LF of 3"-carbon steel piping to oil collection system, and 300 LF of 2"-carbon steel
piping for new boiler economizer
- Weld mating flange to existing boiler stack
- Installation of new economizer on existing stack located 75' above ground elevation
Total Project Value
$50,000
Project Statistics
- 1,000 man-hours
- All work completed with no recordable or lost-time accidents
- All work completed on time and within budget