WEST LINN PAPER —
PROCESS PIPING PROJECTS
West Linn, Oregon

Service Provided
Phoenix Industrial has completed four separate piping projects for this client:
  • SAVE-ALL Piping
    • Fabrication and installation of approximately 1,200 LF of Schedule 10 stainless steel pipe above the SAVE-ALL tank. Pipe sizes ranged from 2" diameter to 8" diameter
    • Work completed in an approximately 60' elevated position. Extensive manual rigging was utilized due to limited equipment access
    • Performed more than 600 diameter-inches of field welding using TIG process
  • DAF Filter Piping
    • Fabrication and installation of approximately 1,200 LF of Schedule 10 stainless steel pipe for new filtration system. Pipe sizes ranged from 1" diameter to 10" diameter
  • COATING Machine Piping
    • Installed pre-fabricated pipe spools for new coating process
    • Installed 1,000 LF of Schedule 10 stainless steel pipe
    • Performed more than 600 diameter-inches of field welding utilizing TIG process
  • Steam Plant Piping
    • Fabrication and installation of more than 900 LF of low-pressure steam and condensate piping. Pipe sizes ranged from 2" diameter to 6" diameter
    • Pipe material included Schedule 80 carbon steel and schedule 10 stainless steel
    • Work included utilization of Phoenix's PP stamp
Total Project Value
$400,000

Project Statistics
  • 4,000 man-hours
  • All work completed with no recordable or lost-time accidents
  • All work completed on time and within budget
Project Timeline
Start Date
  May 2005

Completion Date
  June 2006