West Linn Paper
Boise Paper Solutions
Phoenix Industrial has completed four separate piping projects for this client:
- SAVE-ALL Piping
- Fabrication and installation of approximately 1,200 LF of Schedule 10 stainless steel pipe above
the SAVE-ALL tank. Pipe sizes ranged from 2" diameter to 8" diameter
- Work completed in an approximately 60' elevated position. Extensive manual rigging was utilized due
to limited equipment access
- Performed more than 600 diameter-inches of field welding using TIG process
- DAF Filter Piping
- Fabrication and installation of approximately 1,200 LF of Schedule 10 stainless steel pipe for
new filtration system. Pipe sizes ranged from 1" diameter to 10" diameter
- COATING Machine Piping
- Installed pre-fabricated pipe spools for new coating process
- Installed 1,000 LF of Schedule 10 stainless steel pipe
- Performed more than 600 diameter-inches of field welding utilizing TIG process
- Steam Plant Piping
- Fabrication and installation of more than 900 LF of low-pressure steam and condensate piping. Pipe sizes
ranged from 2" diameter to 6" diameter
- Pipe material included Schedule 80 carbon steel and schedule 10 stainless steel
- Work included utilization of Phoenix's PP stamp
Total Project Value
$400,000
Project Statistics
- 4,000 man-hours
- All work completed with no recordable or lost-time accidents
- All work completed on time and within budget
Project Timeline
Start Date
May 2005
Completion Date
June 2006