EcoLube

Chemical

Phoenix Industrial was selected by a new client, EcoLube Recovery, tobuild all four scope packages for a cutting edge re-refinery process plantin Portland, OR. The previous facility owner faced many environmentalcompliance issues, and Phoenix was quick to facililate permitting andinstalled a new RTO (regenerative thermal oxidizer) in only 28 days. Wewent on to build a whole new process line that converts used oil into aType II base oil additive. In additional to all concrete, steel, mechanicaland electrical work for ClearLube, our electricians designed and installed arefinery-wide electrical systems upgrade. All work disciplines from Phoenixcontributed to this complex installation in a tight environment where theexisting refinery operated on a 24/7 schedule. The projected typicallyaveraged a crew of 30 professionals working an accelerated schedule frombeginning to completion.